Sep 01

GN have existing proposal for ZJ70 drilling mud solids control system, it has been used for an India company and a Chinese oilfield drilling company. And it is flexible for different client’s requirement.

 ZJ70 drilling rig including the following model.

ZJ70 drilling mud solids control system

ZJ70 drilling mud solids control system

·  ZJ70/4500DB TRACK MODULAR RIG

·  ZJ70/4500LD Drilling Rigs

·  ZJ70/4500L Drilling Rigs

·  ZJ70/4500DS Desert Drilling Rigs

·  ZJ70/4500D Drilling Rigs

 A ZJ70 2000HP drilling mud solids control system including the following basic equipments:

1 Trip tank

2 shaker tank

3 suction tank

4 recycling tank

Continue reading »

Share

written by GN Desander Desilter \\ tags: , , , , ,